Antminer S19(360 days) Miners Leasing
The computing power of the entire network will disclose the currency production data of the day.
- Price
- 1,808.22 USD/units
- Electricity Rate
- 0.049 USD/kwh
- Est. Daily Earnings?The computing power of the entire network will disclose the currency production data of the day.
- 0.00005510 BTC/units
- Power
- 3.5kw/h x 1 units
- Hash Power?Hash rate refers to the computing power of the chip of the mining machine.
- 95 TH/s x 1 units
- Reward Points?Purchase products and earn points, there are different rewards for spending' $136.99: get 1 points'
- 13.20 Points
- Maintenance Fee ?The maintenance fee is also called the management fee. The management fee is the mine maintenance, the maintenance of the mine machine, the replacement of spare parts for the mining machine parts, and the maintenance of the mine cooling system. The management fee is the deduction of management fees from the proceeds of digital assets.
- 6%
- Required Time for Launch
- 5 days
Mining type | Hash Power | Electricity Rate | Power | Electricity fee/day | Gross income/day ? The currency used for this revenue calculation comes from the huobi.com data and is updated every ten minutes. |
Net income/day ? The currency used for this revenue calculation comes from the huobi.com data and is updated every ten minutes. |
Electricity cost ratio | Shutdown currency price ? The shutdown price refers to the price of the miner’s miner that is not enough to pay for the electricity cost of mining. It can also be understood as the mining cost price of a certain coin. |
Current currency price ? The currency used for this revenue calculation comes from the huobi.com data and is updated every ten minutes. |
Back to the number of days |
---|---|---|---|---|---|---|---|---|---|---|
Antminer S19(360 days) | 95 X 1TH | $0.049 | 3.5 X 1KW | $4.142 | $5.458 | $1.315 | $75,180.867 | $99,057.679 | 1375 |
1.About Antminer S19
Antminer S19 new high performance miner (95th / s ± 3%), power consumption (3250 ± 5%).
2. Calculation unit
The calculation force of S19 of each ant miner is 95th / s.
3. Electricity cost
The contract electricity fee is 0.33 yuan / kWh (prepaid monthly)
4. Service charge
9% of the original management fee, 6% of the current activity management fee (including mine maintenance, mine machine online, mine machine deployment, mine machine maintenance risk, etc.)
5. Calculation power income
Refer to the poolin ore pool for the mining revenue of mining machine: https://www.poolin.com/
6. Income settlement
The estimated income is calculated from the actual operation of the digital asset network and will change dynamically for reference only; the actual income from mining is the income from digital assets after deducting the service charge of the mining pool, and the service charge collection standard of the mining pool is for reference: https://help.poolin.com/hc/zh-cn/articles/360006827932 The mining revenue is recorded every minute, and the daily settlement of yesterday's mining is at 14:00 Beijing time Mine income is distributed by day (24h). Only when the revenue reaches the amount specified by the platform can it be withdrawn.
7. Miner redemption
In order to ensure the mining efficiency, all the mining machines run in the high standard machine room and do not provide the function of ore pool selection; BTC mining machine has been leased for three years at a time and enjoys the mining machine property rights; if BTC mining machine has been leased for 360 days but less than three years, the corresponding calculation but not the corresponding model of mining machine will be presented; if the mining machine has been leased for less than 360 days, the property rights will not be sent. If GPU mining machine has a total lease term of 4 years, the property right of the mining machine will be presented; if GPU mining machine has a lease term of less than 4 years, the property right will not be provided. For non BTC and GPU mineral machinery leasing in other currencies with a cumulative lease term of 3 years, the property right of the mineral machinery will be presented; for those less than 3 years, there will be no property right. The mineral machinery property right shall be applied for within 30 days after the expiration of the lease term, and those not applied for shall be deemed to have waived the property right. The miner applying for picking up will be delivered from the global mine after the lease expires, and the international / domestic logistics fee will be borne by the user. Declaration: the shelf life of the physical miner is 180 days, and it has passed the warranty when it is removed from the shelf. (statement: 1. Only the mining machine property right will be given to the order after June 15, 2020; 2. All the mining machines will not be guaranteed to be consistent with the model of the order, and the comprehensive theoretical calculation value will not be lower than the calculation value of the order)
8. Termination of contract
If the customer fails to pay the electricity fee on schedule, the contract will be frozen. If the freezing period exceeds 5 days, the contract will be terminated. The contract will automatically terminate upon expiration.
9. Purchase instructions
Before placing an order, please understand the product carefully. If you are unclear, you can consult customer service. Once the order is placed, it means that the product has been approved and there is no refund.
10. Risk tips
The price of digital assets often fluctuates greatly, and the mining difficulty of each currency will be adjusted regularly. A fall in the currency price or a rise in the difficulty will result in a decrease in the yield per miner. Users need to carefully assess their risk tolerance and invest in digital asset mining within acceptable risk control.
The platform reserves the right of final interpretation for the terms of this contract.