BTC

Current price : $7111.00
Mining type Est Daily Revenue(days)
Pangolinminer M20S
Power:3.2kw/h
Hashrate:68T
0.00132789 piece/days
Pangolinminer M21S
Power:3.6kw/h
Hashrate:56T
0.00109356 piece/days

ETH

Current price : $142.00
Mining type Est Daily Revenue(days)
GPU 230M
Power:1.3kw/h
Hashrate:230M
0.01352801 piece/days
GPU 372M
Power:2.2kw/h
Hashrate:372M
0.02188008 piece/days

LTC

Current price : $44.00
Mining type Est Daily Revenue(days)
Antminer L3+
Power:0.9kw/h
Hashrate:504M
0.02424298 piece/days
Antminer L3++
Power:1.1kw/h
Hashrate:580M
0.02789866 piece/days

BCH

Current price : $208.00
Mining type Est Daily Revenue(days)
Antminer S11
Power:1.4kw/h
Hashrate:20.5T
0.0142625 piece/days
Antminer T15
Power:1.5kw/h
Hashrate:23T
0.01600183 piece/days

Hashrate

  • BTC
  • ETH
  • LTC

BTC hashrate

estimated rate of return
14%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

至224%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

Hash amount
1 T/per
Hash price
45.00USD/per
Est Daily Revenue
?

Each serving equals 1 T

0.00001953BTC/per
Time
365days
Electricity Cost
Include 365 days of electricity
Maintenance fee
?

Low management fee

9%    6%
Online date
Effective immediately
$45.00 $55.00
See Details

ETH hashrate

estimated rate of return
15%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

至308%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

Hash amount
10 M/per
Hash price
28.00USD/per
Est Daily Revenue
?

Each serving equals 10 M

0.00060955ETH/per
Time
365days
Electricity Cost
Include 365 days of electricity
Maintenance fee
?

Low management fee

9%    6%
Online date
Effective immediately
$28.00 $46.00
See Details

LTC hashrate

estimated rate of return
13%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

至834%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

Hash amount
50 M/per
Hash price
34.00USD/per
Est Daily Revenue
?

Each serving equals 50 M

0.00240506LTC/per
Time
365days
Electricity Cost
Include 365 days of electricity
Maintenance fee
?

Low management fee

9%    6%
Online date
Effective immediately
$34.00 $42.00
See Details

Mining Rental

  • BTC
  • ETH
  • LTC

Whatsminer M21S(1pac)

estimated rate of return
31%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

至271%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

Hashrate
?

1TH/s means 1 trillion calculations per second, representing the calculation speed of digging bitcoin per second

54 TH/s x 1 units
Mining Price
992USD/units
Est Daily Revenue
?

Each serving equals1table miner.Management fee not deducted.

0.00105450BTC/per
warranty
?

Mining maintenance will be undertaken by the platform during warranty

720 days
Power
?

1kwh=1kw/h

3.6kw/h x 1units
Electricity Cost
0.058 USD/kwh 0.050 USD/kwh
Position fee
?

The aircraft fee includes: the infrastructure of the mine infrastructure, the substation, the substation switch room, the cable input, the cooling system and other equipment room infrastructure.

116 USD/units 0 USD/units
Maintenance fee
?

The maintenance fee is also called the management fee. The management fee is the mine maintenance, the maintenance of the mine machine, the replacement of spare parts for the mining machine parts, and the maintenance of the mine cooling system. The management fee is the deduction of management fees from the proceeds of digital assets.

12% 6%
Online date
2days
$992.00
See Details

GPU Graphics card miner ETH 372M(1pac)

estimated rate of return
0%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

至215%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

Hashrate
?

1MH/s means one million calculations per second, representing the calculation speed of the mining to dig ETH per second.

372 MH/s x 1 units
Mining Price
962USD/units
Est Daily Revenue
?

Each serving equals1table miner.Management fee not deducted.

0.02501219ETH/per
warranty
?

Mining maintenance will be undertaken by the platform during warranty

720 days
Power
?

1kwh=1kw/h

2.2kw/h x 1units
Electricity Cost
0.058 USD/kwh 0.050 USD/kwh
Position fee
?

The aircraft fee includes: the infrastructure of the mine infrastructure, the substation, the substation switch room, the cable input, the cooling system and other equipment room infrastructure.

116 USD/units 0 USD/units
Maintenance fee
?

The maintenance fee is also called the management fee. The management fee is the mine maintenance, the maintenance of the mine machine, the replacement of spare parts for the mining machine parts, and the maintenance of the mine cooling system. The management fee is the deduction of management fees from the proceeds of digital assets.

11% 6%
Online date
2days
$962.00
See Details

Antminer L3++(1pac)

estimated rate of return
0%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

至594%
?

Estimated rate of return:
[Revenue of the day]: Multiply by the currency price of the day by the calculation of the output of the day and multiply by the term "lease term" equal to "revenue".
[Return]: "Net income" ("revenue" minus "mine machine price" minus "total electricity bill" = "net income") divided by "cost" (cost = "mining machine price + total The electricity cost of the day") = "return rate".
[The highest income in 2017]: The "2017 highest currency price" multiplied by "the day's computing power output" multiplied by the "lease term" is equal to "the highest income this year."
Both the price of the currency and the output of the computing power have risen and fallen. The actual calculated figures should be changed according to the actual situation. The above is for reference.

Hashrate
?

1MH/s means one million calculations per second, which represents the calculation speed of the miner to dig Litecoin per second

580 MH/s x 1 units
Mining Price
84USD/units
Est Daily Revenue
?

Each serving equals1table miner.Management fee not deducted.

0.02789866LTC/per
warranty
?

Mining maintenance will be undertaken by the platform during warranty

720 days
Power
?

1kwh=1kw/h

1.1kw/h x 1units
Electricity Cost
0.058 USD/kwh 0.050 USD/kwh
Position fee
?

The aircraft fee includes: the infrastructure of the mine infrastructure, the substation, the substation switch room, the cable input, the cooling system and other equipment room infrastructure.

87 USD/units 0 USD/units
Maintenance fee
?

The maintenance fee is also called the management fee. The management fee is the mine maintenance, the maintenance of the mine machine, the replacement of spare parts for the mining machine parts, and the maintenance of the mine cooling system. The management fee is the deduction of management fees from the proceeds of digital assets.

11% 6%
Online date
2days
$84.00
See Details

Mining Rental

Dig out BTC, ETH… easily by renting mining hashrate.

Our Advantages

Global hashrate node deployment to maximize your profits

High Value Performance

High Value Performance

Lower mining price

Cheaper overseas electricity

High Security

High Security

Large overseas mines

Preferential policy support

High Level Service

High Level Service

High standard professional farm

Professional maintenance team

Property Model

Property Model

One-second mining

Two-year warranty

hide