Lang

Mining Machine Hosting, large-scales of mine field globally

Dual-line 450MW power supply, over 300 thousands of mining machines are supported.

RHY mine scene

Parameters for Mining Machine Hosting

Hosting for BTC mining machines and ETH mining machines are supported

Antminer ?
T9+, S9 series,, S15 series L3 series, etc., can be managed by mining machine type details
Avalon ?
A851, A841, etc.,can be managed host type details, contact customer service
Pangolinminer ?
M3, M10, etc., can be managed to mine type details, contact customer service
Min-amount ?
Mining machine hosting 500 units
500 units 500 units 500 units
International Shipping ?
Based on actual conditions and settlement by third-party international logistics companies
Around $3 per unit Around $3 per unit Around $3 per unit
Income Distribution Customer designated mining pool Customer designated mining pool Customer designated mining pool
Income hand out Customer designated wallet Customer designated wallet
Customer designated wallet
Electricity Cost ?
1 degree =1kw/h
0.037USD/kwh 0.028 USD/kwh ?
Activity limited time to buy: as of 2019-3-31
Activity limited edition: 10,000 managed seats
Monthly average BTC price Managed electricity bill
less than 3,675.000 0.028USD/kwh
3,676.471-4,042.647 0.029USD/kwh
4,044.118-4,410.294 0.031USD/kwh
4,411.765-4,777.941 0.032USD/kwh
4,779.412-5,145.588 0.034USD/kwh
5,147.059-5,513.235 0.035USD/kwh
5,514.706-5,880.882 0.037USD/kwh
5,882.353-6,248.529 0.038USD/kwh
6,250.000-6,616.176 0.040USD/kwh
6,617.647-6,580.735 0.041USD/kwh
6,985.294-7,351.471 0.043USD/kwh
735.294-7,719.118 0.044USD/kwh
7,720.588-8,086.765 0.046USD/kwh
more than 8,088.235 0.047USD/kwh
0.037USD/kwh 0.028 USD/kwh ?
Activity limited time to buy: as of 2019-3-31
Activity limited edition: 10,000 managed seats
Monthly average BTC price Managed electricity bill
less than 3,675.000 0.028USD/kwh
3,676.471-4,042.647 0.029USD/kwh
4,044.118-4,410.294 0.031USD/kwh
4,411.765-4,777.941 0.032USD/kwh
4,779.412-5,145.588 0.034USD/kwh
5,147.059-5,513.235 0.035USD/kwh
5,514.706-5,880.882 0.037USD/kwh
5,882.353-6,248.529 0.038USD/kwh
6,250.000-6,616.176 0.040USD/kwh
6,617.647-6,580.735 0.041USD/kwh
6,985.294-7,351.471 0.043USD/kwh
735.294-7,719.118 0.044USD/kwh
7,720.588-8,086.765 0.046USD/kwh
more than 8,088.235 0.047USD/kwh
0.037USD/kwh 0.028 USD/kwh ?
Activity limited time to buy: as of 2019-3-31
Activity limited edition: 10,000 managed seats
Monthly average BTC price Managed electricity bill
less than 3,675.000 0.028USD/kwh
3,676.471-4,042.647 0.029USD/kwh
4,044.118-4,410.294 0.031USD/kwh
4,411.765-4,777.941 0.032USD/kwh
4,779.412-5,145.588 0.034USD/kwh
5,147.059-5,513.235 0.035USD/kwh
5,514.706-5,880.882 0.037USD/kwh
5,882.353-6,248.529 0.038USD/kwh
6,250.000-6,616.176 0.040USD/kwh
6,617.647-6,580.735 0.041USD/kwh
6,985.294-7,351.471 0.043USD/kwh
735.294-7,719.118 0.044USD/kwh
7,720.588-8,086.765 0.046USD/kwh
more than 8,088.235 0.047USD/kwh
Mine infrastructure fee ?
Mine construction, power supply facilities, expansion tax, etc.
2.941USD/units 2.941USD/units 2.941USD/units
Repair parts fee Maintain and replace accessories Maintain and replace accessories Maintain and replace accessories
1. Prepayment for the cost of two months' electricity is required (deposit included). Machines would be placed in the order (60 days after the reservation, including the shipping for 25 days).
2. Mining Machines will be kept in the Mining field belongs to RHY.com, which will be taken care of by the specialists 24/7.
3. Mining information such as the cryptocurrency you'd like to mine and your crypto wallet address should be provided before the payment.
4. Mining will be started within 5 working days after the machine's been received. Information of hashrate and profit could be checked through the link of the mine pool.

Mining machine hosting process

Simple four-step, easy mine hosting

After buying mining

Choose hosting service

Wait for delivery

To mine

arrived mine

Deploying mining by professionals

Minings

Gain profit

Real-life picture of mining machine

Large mine, professional RHY mining center

60MW overseas transformers directly supplied by Jiangsu Huapeng

Cable and mining machine

Mining maintenance will be undertaken by the platform during warranty

Cooling curtain

Exhaust system

Switch room

hide