Lang
Snow panther B1+

Snow panther B1+

Weight6.5KG
Delivery timeIn the day
Amount
- +
Service Method Send by post
Delivery Address China
Actually paid
$672.00 $672.00
product

1. This product contains power supply, full payment is required, logistics freight is paid, and the specific freight needs to consult the logistics supplier;

2. Delivery time: The same day before 6 pm on the same day of payment, the payment will be postponed to the next day after 6 pm;

3. Delivery location: China

parameter

Rated Hash: 24.5T±5%

Wall power consumption: 2100W ± 10% (AC/DC 94% efficiency, 25 ° C ambient temperature)

Chip energy efficiency: 0.082J/GH (wall, AC / DC 94% efficiency, 25 ° C ambient temperature)

Guest voltage: 14.5~15.5V

Number of cymbals :288 PCS

Dimensions: (L) 370mm*(W)150mm*(H)185mm

Operating temperature :5%RH ~ 95%RH, non-condensing

Network connection: 10/100/1000MBase-T


Precautions:

1.If the chassis is deformed or the heat sink is off,please do not power on,contact after-sales service

2.Cannot use two power supplise with the same power board

payment

1. After placing the order, please remember to contact the RHY staff to determine the current price of the mining machine. The price is not determined with the staff member, and the payment order is invalid.

2. Please select the payment method in time after placing the order. If the order is not selected, the payment cannot be confirmed.


risk warning:

The price of the currency determines the value of the mining machine. After the payment, the quantity and price of the order will be locked. The price of the currency will increase. The order will not increase the price. Otherwise, the price will drop and the order will not be refunded.

After sale

Mining are different from consumer electronics, but products that are specially tailored to the needs of customers and used for investment, so investment should be cautious.


The terms of after-sales service of this product are as follows. Once purchased, it is deemed to be an endorsement of this clause.


1. Once you have paid for the mining, you will enter the ordering process and cannot return it. Please order carefully.

2. The warranty period of the mining product is 180 days from the date of shipment (contact the mining manufacturer for warranty).

3. Due to market fluctuations, the price of the product may be adjusted at any time after your purchase. We do not accept the obligation of prior notice and price compensation.

Pre-output analysis comparison
Mining type Hashrate Electricity Cost Power Electricity fee/day Gross income/day ?
The currency used for this revenue calculation comes from the huobi.com data and is updated every ten minutes.
Net income/day ?
The currency used for this revenue calculation comes from the huobi.com data and is updated every ten minutes.
Electricity cost ratio Shutdown currency price ?
The shutdown price refers to the price of the miner’s miner that is not enough to pay for the electricity cost of mining. It can also be understood as the mining cost price of a certain coin.
Current currency price ?
The currency used for this revenue calculation comes from the huobi.com data and is updated every ten minutes.
Back to the number of days
Snow panther B1+ 25 X 1TH $0.045 2.2 X 1KW $2.364 $7.579 $5.215
31
$3,408.808 $10,928.333 129
Snow panther B1+ 25 X 1TH $0.052 2.2 X 1KW $2.758 $7.579 $4.821
36
$3,976.943 $10,928.333 140
Snow panther B1+ 25 X 1TH $0.060 2.2 X 1KW $3.152 $7.579 $4.427
41
$4,545.078 $10,928.333 152
hide